| Customization: | Available |
|---|---|
| After-sales Service: | Online |
| Connection Form: | Bolt Connection |
| Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
|---|
| Payment Methods: |
|
|---|---|
| Support payments in USD |
| Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
|---|
| Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
|---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
|
main steel frame
|
H section steel beam and columns, painted or galvanized
|
|
Secondary frame
|
Hot dip galvanized C purlin , steel bracing , tie bar , knee brace , edge cover etc.
|
|
Roof panel
|
EPS sandwich panel , glass fiber sandwich panel , rock wool sandwich panel , and PU sandwich panel or steel sheet
|
|
Wall panel
|
Sandwich Panel or Corrugated Steel Sheet
|
|
Tie Rod
|
Circular Steel Tube
|
|
Brace
|
Round Bar
|
|
Knee Brace
|
Angle Steel
|
|
Roof Gutter
|
Color Steel Sheet
|
|
Drawing
|
We can make the design and quotation according to your require or your drawing
|

1. Who we are?
We are a global one-stop manufacturer, specializing in delivering end-to-end services from innovative design to professional installation, with a proven track record of high-quality execution.
2. Are you a factory or a trading company?
We are a direct manufacturer with our own production facility, enabling us to offer highly competitive factory prices. Our state-of-the-art factory , ensuring large-scale project fulfillment with efficiency.
3. What quality assurance and guarantees do you provide?
We implement a rigorous, multi-stage quality control system that covers every phase of production.
4.Do you offer designing service for us?
Yes, we could design full solution drawings as your requirements.
5.What is your terms of payment?
T/T 30% as deposit in advance, and 70% to be transferred before booking space.
6. What is the delivery time?
Delivery time depends on order quantities. In general, the delivery time to the nearest seaport in China will be 40 days after receiving the deposit.